The San Francisco VA Medical Center requires the services of a qualified General Contractor to construct Project 662-23-105, Renovate Sterile Processing Service. The general scope of this requirement is to construct via extensive renovation a sterile processing department that complies to current design criteria including HVAC and water processing. Execution will also require site prep and rental of a mobile processing trailer for the duration of the interior work. The nature and requirements of this construction are fully exhibited in the attached Construction Documents which include the following:
Construction Documents Combined Drawing Set – This comprises the full drawing set as a single file. Groups by discipline or individual sheets can be provided via RFI during the proposal phase or post-award.
662-23-105_Final CD Specifications 1 of 2_V1 – This is volume 1 of the project specifications
662-23-105_Final CD Specifications 2 of 2_V2 – This is volume 1 of the project specifications
662-23-105_Project Room Contents – This is the equipment plan depicting contents by room and identifying the corresponding JSN codes for items
662-23-105_Equipment Cutbook – This is the equipment inventory at time of design completion. The JSNs of the indicated products match 662-23-105_Project Room Contents for easy cross reference.
Template Infection Control Risk Assessment – This is a partly-prepopulated ICRA which demonstrates categories and work restrictions. The remaining data is to be populated and posted at job site at commencement of work.
The exterior area of construction is located directly adjacent to Building 2 on the northwest face of the building. This location is primarily pedestrian access with minor deliveries. Work is primarily site and utilities work for preparation of trailers. The adjacent building area is primarily engineering and administrative space and as such, no significant restrictions on hours of work will be encountered.
The interior area of construction is located on 3rd floor of building Building 200; effectively the west side of the building on the top floor. This area is directly adjacent to the Operating Room Suite which will remain operational. As such, hours of work for any activities that generate even moderate levels of noise will be restricted to weekends, holidays, evenings, and nights (WHEN) hours. Noise, vibration, and dust control should be expected to be heavily managed with limitations strictly coordinated. For purposes if pricing, total labor effort should be assumed to comprise roughly 50% of total labor outside of normal business hours. As is generally requested, the government will support work hours beginning as early as 0400 as a standard given coordination on the 3-week look-ahead schedule. Hours beyond this are subject to additional notification.
SDVOSB participation is encouraged.