The Work consists of construction of Owner’s Wilfred Booster Station
Resiliency project located at 4980 Commerce Boulevard, Rohnert Park, California. The Work
includes, but is not limited to, demolition of the existing medium voltage switchgear and
installation of Owner-furnished medium voltage switchgear; demolition and replacement of the
existing booster pump with a new booster pump; installation of a secondary booster pump and
associated valves and piping to provide redundancy; and upgrades to the control system for
operating the facility. Work shall be completed within 610 Days from the date when Contract
Time commences to run. Bidding Documents contain the full description of the Work.