The proposed work is as follows: 1. Mobilization/Demobilization: Mobilization/removal of construction materials and construction equipment, payment of bonds and insurance, permits, preconstruction conference and photographic documentation, and other preparatory work limited to a maximum amount of five (5) percent of the Bid Price. 2. Construction of the 3 Water Pumping Improvements in the Pump Pit, including replacement of the existing (4) 3 Water pumps and associated pipe supports, piping, valves and appurtenances and pads, connections to existing systems, instruments, conduit and wiring, electrical and instrumentation, demolition of existing piping and appurtenances, and incidentals for a complete and usable facility as indicated on the Contract Documents. 3. Construction of the Ferric Chloride to Combined Sludge Line Project, including installation of new ferric chloride metering pumps, ferric chloride transfer pump, ferric chloride day tank, connections to ferric chloride yard piping, and associated appurtenances, piping and injection point, pads, connections to existing systems, instruments, conduit and wiring, electrical and instrumentation, demolition of existing piping and appurtenances, and incidentals for complete and usable facility as indicated on the Contract Documents. 4. Construction of the stormwater pump improvements in the Pump Pit, including demolition of 4 existing spent backwash pumps and associate pipe supports, installation of 4 new stormwater pumps, piping, pipe supports, valves and appurtenances and pads, connections to existing systems, instruments, conduit and wiring, electrical and instrumentation, potholing to confirm stormwater connections, and incidentals for a complete and usable facility as indicated on the Contract Documents. 5. Additive Bid Item: Stormwater connection if confirmed through potholing that it has not been constructed. 6. All other work required to make the project whole and complete.
Final completion shall be within 280 working days from the Notice to Proceed.