SCOPE OF WORK
- Work to be performed
The Project and Contractor’s Scope of Work involves the following main elements:
- Refer to Appendix B for the detailed technical requirements of the Work.
- Preconstruction jobsite inspection and work planning, including preparation of detailed
workplans for:
1) Equipment lock-out /tag-out;
2) Hoisting and rigging plan;
3) Pump and feeders removal;
4) Pipe and fittings removal and replacement to ensure proper fit;
5) Piping and fittings installation;
6) Electrical conduits, supports, and related accessories installation;
7) Pump and feeders installation.
The work is located at: onsite Inlet Pump Station concrete building. Most of the electrical work
will be at the MCC on the ground floor and most concrete, mechanical, hoisting, rigging, and
pump installation work will be located 2 floors below ground.