Bid Details for Fairfield-Suisun Sewer District (FSSD, District) Inlet Pump Station Pump 3 Replacement

Project
Fairfield-Suisun Sewer District (FSSD, District) Inlet Pump Station Pump 3 Replacement
Owner
Fairfield-Suisun Sewer District (FSSD, District)
Bid Time
09/04/2025 2:00 pm
Description

SCOPE OF WORK

  1. Work to be performed

The Project and Contractor’s Scope of Work involves the following main elements:

  1. Refer to Appendix B for the detailed technical requirements of the Work.
  2. Preconstruction jobsite inspection and work planning, including preparation of detailed

workplans for:

1) Equipment lock-out /tag-out;

2) Hoisting and rigging plan;

3) Pump and feeders removal;

4) Pipe and fittings removal and replacement to ensure proper fit;

5) Piping and fittings installation;

6) Electrical conduits, supports, and related accessories installation;

7) Pump and feeders installation.

 

The work is located at: onsite Inlet Pump Station concrete building. Most of the electrical work

will be at the MCC on the ground floor and most concrete, mechanical, hoisting, rigging, and

pump installation work will be located 2 floors below ground.

Location
1010 Chadbourne Rd., Fairfield CA 94534
Amount
Bid Walk

Pre-Bid Site Inspection

The Owner will allow Contractors access to the jobsite for inspection and to answer questions

on Tuesday, August 26, 2025 at 10:00 am. Contractors shall promptly arrive at the District’s

Treatment Plant at 1010 Chadbourne Rd., Fairfield CA. Contractors are encouraged to

attend to inspect the job site and ask questions.

Requirements
Availability