The Nitrogen Removal Phase 1 Improvements Project
includes the following work:
• Upgrades to existing Aeration Basins 1 through 4 including construction of new
concrete baffle walls, repair of existing concrete and concrete joints, replacement
of existing aluminum handrail and aluminum planking, replacement of the
aeration diffusers and air drop legs, installation of submersible mixers,
replacement of existing spray water piping, replacement of existing valves, and
other miscellaneous improvements.
• Construction of a new Aeration Basins Electrical Building to supply power to the
new and existing equipment at the aeration basins.
• Electrical and controls work including the installation of power distribution
equipment, ductbanks, pullboxes, conduits wire, field devices and instruments
and testing and integration of all new and modified equipment.
• Civil work including replacement of existing paving and construction of new
paved areas.
• All other work shown and specified within the Contract Documents.
The WORK must be completed within Nine hundred (900) calendar days.