Turlock Dried Solids Laydown Area

Owner: 
City of Turlock
Bid Date: 
Wednesday, October 2, 2019 - 14:00
Description: 

The work consists, in general, of construction of a dried solids storage area 330 feet square (108.900 square

feet in area) paved with asphalt, soil cement, subgrade improvements, and drainage. Additional work includes

the provision of a concrete washdown area, Vactor dumping structure, recycled water distribution mains,

electrical conduit, vaults and street light bases for future lighting and electrical distribution. The new facilities

will be served by an improved access road, and surrounded by a perimeter reinforced concrete push wall.

Location: 
Regional Water Quality Control Facility (RWQCF) at 901 S.
Amount: 
$2.4M
Estimator: 

Larry Etcheverry (510)234-0926

larrye@overaa.com

Bid Walk: 
9:30 AM on September 18, 2019
Bid Walk: 

A mandatory pre-bid meeting will be held on site commencing at the Turlock Regional Water Quality Control

Facility public parking lot located at 901 S. Walnut Road at 9:30 AM on September 18, 2019. Attendance

is mandatory for bidders submitting a bid on the project.

Availability: 

Copies of the Contract Documents, including Instructions to Bidders, Bid Proposal forms, Plans and

Specifications, may be downloaded from the engineering division’s web site or purchased for a nonrefundable

fee of Fifty Dollars ($50.00) at the Office of the City Engineer, 156 S. Broadway, Ste. 150,

Turlock, CA 95380, Phone (209) 668-5520. For additional information, go to

http://www.CityofTurlock.org/capitalprojects