Jefferson Elementary School District Workforce Housing

Bid Date: 
Friday, May 21, 2021 - 14:00
Estimated Start Date: 
Wednesday, July 7, 2021 - 08:00
Description: 

Overaa Construction, the Design Build Entity General Contractor for the Jefferson Elementary School District, is seeking bids for the District's Workforce Housing Project in Daly City, CA. The project consists of building a 56 unit modular housing complex surrounding a central Community Building, and accompanying sitework and utilities. The residences will be built off-site using volumetric modular construction. Site built components include the entire Community Building, exterior enclosure of residential buildings outboard of factory built modules, residential building utility closets, trash enclosures, postal kiosk, steel pan stairs, breezeways, & balconies. Specific trades include, but are not limited to: scaffolding, cast-in-place concrete, concrete reinforcing, site concrete, PP&F, module transport, module setting, masonry, metal stairs, metal fabrications, architectural wood casework, waterproofing, traffic coatings, insulation, sheet metal flashings, weather barrier, joint sealants & firestop, doors, frames, and hardware, storefronts, drywall, paint, ceramic tile, resilient flooring, signage, toilet accessories, fire extinguishers & cabinets, appliances, earthwork, grading, asphalt paving, pavement markings, fences and gates, landscape, and site utilities.

Bidders should note that the residential building modules come with nearly complete interiors from the factory, but bidders must include any work associated with seaming-together of building modules including patching of leave-outs where required for structural or MEPFP connections between modules and plug walls. Drawings generally indicate where work within units is to occur as part of assembly of the modules, but not all elements are necessarily indicated. A summary of these locations is included to assist the bidders to quantify this scope of work. Each bidding subcontractor must include all on-site work shown, or that can be interpreted, or extrapolated as necessary to provide a complete, finished product.

For example, a pass-through opening between adjacent modules will require seaming of flooring and drywall. The factory will ship-loose flooring for flooring subcontractor to install at these seams. Drywall subcontractor will furnish and install material to close and finish the jamb and head of the seam. This is just one example of work necessary to provide a complete scope. There are others, and bidders must include all on-site work shown, or that can be interpreted, or extrapolated as necessary to provide a complete, finished product.

 

To reduce ambiguity whether work is to be done in factory or on-site, bidders are encouraged to:

ask questions about scope in writing by 5/18/21

reference Overaa Scope Clarification included in "Other Documents" folder.

reference the "State Set" drawings which uses the following nomenclature: [S] to indicate work done on-site, and [F] to indicate work done in-factory.

read sheet notes which indicate whether work is to be done as on-site or in-factory.

 

MODULE TRANSPORT:

Module transport subcontractor must transport modules from staging yard at Daniel Webster Elementary School (approximately one mile from job site) to designated pick point at job site. Module transport subcontractor's scope includes development and coordination of route, permitting, traffic control, flagging, pilot cars, and insurance as required to transport modules.

 

MODULE HOISTING:

Module hoisting subcontractor must provide crane, rigging, spreader, labor, and insurance to pick modules from module transport and set into final location at job site.

Bids should include all necessary labor, material, and equipment to provide a complete scope package for the given trade.

 

DESCRIPTION OF PROJECT DOCUMENTS

1. 20210305 JESD_MODULAR ARCH STATE SUBMITTAL2

a. Drawings for factory built volumetric modules.

b. Note these drawings mainly depict work to be done in-factory, but also delineate where factory work stops and on-site work starts.

c. Notes have been added to these drawings to delineate on-site work vs. factory work.

c.  All on-site work shown, or that can be interpreted, or extrapolated as necessary to provide a complete, finished product shall be included in subcontractor’s bid.

 

2.  JESD_100% CD_Local Set_VOLUME 1

a.  Drawings for site built elements including but not limited to: earthwork, utilities, cast-in-place concrete, site concrete, masonry, exterior enclosure of residential buildings outboard of factory built modules, utility closets at residential buildings, breezeways, stairs, balconies, parapets at residential buildings, non-residential doors, frames, & hardware, drywall, paint, and flooring at factory leave-outs or seams, signage, paving, striping, landscaping, site amenities, fencing

b.  All on-site work shown, or that can be interpreted, or extrapolated as necessary to provide a complete, finished product shall be included in subcontractor’s bid.

 

3.  JESD_100% CD_Local Set_VOLUME 2

a.  Drawings for factory built elements including but not limited to: residential mechanical systems, residential plumbing systems, residential electrical systems, residential Title 24.

b.  Drawings for site built and factory built residential fire protection.

c.  Drawings for site built Community Building including but not limited to: cast-in-place concrete, wood framing and drywall, exterior finishes, flashings, insulation, roofing, doors, frames, & hardware, storefront windows, interior finishes, ceramic tile, resilient flooring, paint, casework, appliances, signage, exterior wood deck, Title 24, mechanical, electrical, and plumbing systems

c. Drawings for site built elements including but not limited to: mail enclosure, trash enclosure.

d.  All on-site work shown, or that can be interpreted, or extrapolated as necessary to provide a complete, finished product shall be included in subcontractor’s bid.

 

4.  JESD Faculty + Staff Housing - 100% CD Specs - 03-02-21

a.  Specifications for factory and site built elements.

 

5.  MP BROWN SOILS REPORT

a.  Site soils report

 

6. Overaa Scope Clarification

a. Document created by Overaa to assist in clarifying scope and project documents providing further detail about a given scope.

 

ALL SUBCONTRACTORS ARE INVITED TO BID ON ANY SCOPE, INCLUDING BUT NOT LIMITED TO SCOPES TO WHICH THEY ARE INVITED. E-MAIL BIDS TO bids@overaa.com

 

Location: 
305 Eastmoor Avenue, Daly City, CA 94015
Estimator: 

Athan Hadjimarkos (510)234-0926

athanh@overaa.com

Availability: 

Documents are available on https://www.buildingconnected.com for viewing in our office at 200 Parr Blvd., Richmond, CA 94801 and available to purchase from Richmond Blue Print at 510-234-2632.