Carquinez Middle School Replacement Campus

Owner: 
John Swett Unified School District
Bid Date: 
Wednesday, August 21, 2019 - 14:00
Description: 

Project Description: The construction of a new 3 story, 41,271 sf, Carquinez Middle School in Crockett, CA with 8,818 sf of exterior covered walks and a 1,660 sf stage.  Construction includes a new 3 story classroom building, kitchen, gymnasium, stage, cafeteria, administration floor, library, site improvements, and site retaining walls. 

Work includes, but is not limited to;  demolition, abatement, survey, scaffolding, earthwork, AC paving, site concrete, fencing landscape & irrigation, site utilities, subdrainage, structural concrete, rebar, precast concrete, GFRC, gypsum cement underlayment, masonry, structural steel & miscellaneous metals, rough framing, casework & countertops, FRP paneling, fluid applied waterproofing, insulation, air & moisture barrier membrane, asphalt shingles, concrete roof tiles, fiber cement wall & soffit panels, mod bit roofing, sheet metal, roof hatches, firestopping, joint sealants, expansion control, doors/frames/hardware, coiling counter doors, sectional overhead doors, storefronts & glazing, louvers, metal stud & drywall, plaster, tile acoustical ceilings, metal ceiling panels, wood athletic flooring, resilient sheet flooring, resinous flooring, tile carpet, floor sealer, polished concrete flooring, wall coverings, painting, markerboards/tackboards, signage, toilet compartments & accessories, folding panel partitions, wall & door protection, emergency key cabinets, metal lockers, fire extinguishers & cabinets, food service equipment, athletic equipment, roll down shades, telescoping bleachers, electric traction elevators, wheel chair lifts, fire sprinkler system, plumbing, HVAC, and electrical. 

Owners budget for all work is $31,800,000

Project estimated construction start date is 9/23/19 with an 18 month duration. 

There is a PSA on this project.  Skilled and Trained workforce is required for this project. 

This is a lease/lease back project where Overaa has been selected as the general contractor.

There are 5 Alternates to consider.  Refer to the Document List for Critical Scopes of Work to be Acknowledged.

MEPF trades are required to be prequalified with the John Muir Unified School District.  Pre-qualifications are required prior to subcontract award.  Forms are included with the bid documents.

Project Location: 1099 Pomona St, Crockett, CA 94525

Location: 
1099 Pomona St, Crockett, CA 94525
Amount: 
$31,800,000
Estimator: 

Contact:  Bryan Dissman (510)234-0926

Email: bryand@overaa.com

Requirements: 

Local hiring and local, small, and/or emerging businesses and Disabled Veterans Business Enterprise (“DVBE”) firms are encouraged to participate.

MEPF trades are required to be prequalified with the John Muir Unified School District.  Pre-qualifications are required prior to subcontract award.  Forms are included with the bid documents.

Availability: 

Documents are available on www.isqft.com contact jenniferb@overaa.com for access.