Carquinez Middle School

Owner: 
John Swett Unified School District
Bid Date: 
Wednesday, February 20, 2019 - 14:00
Description: 

The construction of a new 43,346 SQFT Carquinez Middle School in Crockett, CA requires 2 increments of work.  This bid invitation is for pricing for Increment 1 and requires the demolition and abatement of the existing band room and surrounding site work, rough grade site, installation of site utilities, and electrical.  Work includes, but is not limited to electrical, demolition, abatement, earthwork, site utilities, temporary barriers and fencing, utility safe off, and SWPPP.

This is a Lease Lease-Back project. We are looking for complete and competitive pricing along with constructability and value engineering. Bids are due 2/20/19 at 2pm

Owners budget for all work is $31,800,000 (this includes both Increments).

There is a PSA on this project.

MEPF trades are required to be prequalified with the John Swett Unified School District.

Location: 
1099 Pomona Street, Crockett, CA 94525
Amount: 
$31,800,000
Estimator: 

Bryan Dissman (510)234-0926

bryand@overaa.com

Availability: 

Contact jenniferb@overaa.com to access the project documents on www.isqft.com