Bid Details for WATERMAN WATER TREATMENT PLANT HIGH LIFT PUMP & POWER UPGRADE PROJECT

Project
WATERMAN WATER TREATMENT PLANT HIGH LIFT PUMP & POWER UPGRADE PROJECT
Owner
City of Fairfield
Bid Time
09/17/2024 2:00 pm
Description

The work consists of, but is not limited to the removal and replacement

of all five high lift vertical turbine pumps, pump discharge silent check valves, air release valves,

butterfly valves/motor operators, pump 1 and 2 discharge piping upsize modifications, removal

and replacement of black vinyl coated chain link fence and gate where shown, replacement of

westerly concrete walk with new wider sidewalk, which includes but is not limited to the

sawcutting and removals of existing PCC concrete pavement and curbs, new 8 inch wide curb

under portion of new fence, replacement of wet well access hatch with a larger custom combined

access hatch and vent/overflow aluminum hatch, patching AC pavement along new conduit

trenches to the Zone 3 pump station, removal and disposal of the old Zone 3 pump station’s

abandoned 12” suction water piping that is being relocated by others (assumed to be ACP and

cement lined and coated weld steel pipe), new CMU retaining wall and reinforced concrete

generator pad, excavation of existing slope bank for new generator retaining wall and pad, offsite

disposal of excess excavated soil from generator pad area, tree stump and root ball removal,

removal AC pavement and portion of concrete v-ditch for constructing a new 12” wide concrete

trench drain along west edge of generator pad, miscellaneous electrical modifications for

changing the utility power service from 4,160 volts to 480 volts, new 12kv to 480kv transformer

pad, PG&E bollards, furnish and install new 4” conduit for new PGE service, transformer pad, new

variable frequency drive (VFD) panels for all five new pumps, installation of the new City pre-

purchased utility section meter/main switchboard with solar breaker section, manual transfer

switch (MTS) sections and power distribution panel sections, furnish and installation of all new

conduit and wire as required in power room and for overhead power and controls to new pumps,

new underground conduits and wire for change of voltage modifications to the Zone 3

pump/blower building, removal of existing 4160v to 480v transformer, miscellaneous AC patching

and installation of a new 1250 KW emergency generator with 2,323 gallon subbase diesel tank.

The emergency generator has been pre-purchased by the City and will be furnished to the

successful bidder. The successful bidder will need to move/relocate the pre-purchased generator

from its temporary storage site once the proposed retaining wall and site work for the

housekeeping generator pad is completed and shall carefully move the generator using a large

crane in order to install/anchor the generator to the housekeeping pad per the project plans,

special provisions and technical specifications, and shall coordinate and schedule the start-up

testing and the start of the warranty for the generator with the generator vendor.

 

 

Duration : 300 working days from the date of said written notice to proceed.

Location
Fairfield, CA
Amount
$6,665,000
Bid Walk

A mandatory pre-bid meeting for prospective bidders of the project will be conducted by the OWNER

at 2:00PM on August 29, 2024. The meeting will be located at Waterman Water Treatment Plant on 2900 Vista Grande, Fairfield, CA 94534

Requirements
Availability
OBTAINING CONTRACT DOCUMENTS: Copies of the contract documents, specifications and drawings may be obtained by logging onto http://www.fairfieldplanroom.com or by calling BPX Printing at (707)745-3593. These items may obtain a set price of $175.00, plus shipping, and is non-refundable. All bidders are recommended to purchase a complete bid set from BPX Printing prior to bid opening in order to ensure receipt of addenda notifications