The Project generally consists of a two story building approximately 10,300 Gross Square Feet of men’s and women’s locker room facilities, training space, multipurpose space and related facilities. The preliminary program is listed below and is subject to change. Men’s Locker Room, Women’s Locker Room, Restrooms, Training Space, Storage & Janitorial Closets, Multipurpose Space, Warming Kitchen, Storage Spaces, And Public Restrooms, Outside Balcony Area, Hardscape Areas throughout.
Alternates:
– Level 2 Bar, see “Plans” folder for drawing.
Project requirements are as follows:
-
The Project Budgeted Direct Construction Cost is $15,000,000.
-
The Project construction duration is estimated to be 14 months.
DEFERRED SUBMITTALS / DESIGN-BUILD ITEMS
1. FIELD GRADING AND DRAINAGE
2. FIRE ALARM SHOP DRAWINGS
3. SUSPENDED METAL CEILING FRAMING
4. WATER WELL – LOCATION OF THE WELL AND ITS COMPONENTS ARE TO BE DESIGN BUILD. SEE NOTES ON SHEET A101
DELEGATED DESIGN
1. AUTOMATIC FIRE SPRINKLER SYSTEM
2. SUSPENDED METAL CEILING FRAMING
Disabled Veteran Business Enterprise (DVBE) participation is encouraged.