Furnishing and installing Booster #1 (50 HP/670 GPM/225’ TDH), Booster #2 (50 HP/670GPM/225’ TDH) with pump cans and concrete pad, 12’x12’ FRP pump house, motor control center (MCC) with CMU shelter and concrete pad, 10” & 12” DICL suction piping, 8” & 10” DICL discharge piping, two 8” flowmeters with cages, 375 gallon bladder tank with concrete pad, 6” DICL piping and safety ladder, pressure cabinet, pressure transmitters, electrical conduits & cables, sensing lines, two 6” pumper connections, water quality sample station, irrigation service and piping, concrete sidewalks, retaining wall, site paving, grading and drainage improvements for SJWC Belgatos Reservoir Station in the Town of Los Gatos, CA.
25% Participation is encouraged for women, minority, disabled-veteran and lesbian, gay, bisexual and transgendered (LGBT) business enterprises.