Scope of work includes:
This is an Overaa project.
We are requesting budgets based on the DSA Backcheck bid documents.
Building “A” was built in 1922 and it was reconstructed in 1935 to comply with the Field Act. The two stories structure includes administration office spaces, classrooms, auditorium with balcony level and La Clinica health clinic. Total area is 78,336 SF.
Alterations to Building “A” shall include but not limited to voluntary seismic upgrades, reroofing, enlarging existing classrooms, new heating and ventilation system, main office renovation, new entry ramp, ADA parking stalls, modifications of existing fire sprinkler system, fire alarm, intrusion alarm, clock/bell/PA and data/network systems. Includes new 3000Amp switchgear equipment to replace existing switchgear and new PG&E transformer pad. Scope also includes restoring playground to original conditions after portables are removed including removal of temporary utilities serving portables, new garden, asphalt paving, restoring artificial turf field, bioretention swales, restriping and new landscaping.
Renovation of Building “A” will be completed in two phases by splitting Building “A” in two halves: One half will vacate (in phase 1) to portable interim housing while the other half remains occupied for academic learning. When construction in phase 1 is completed, the second half will vacate (phase 2) to portable interim housing while phase 1 re-occupies for academic learning. The health clinic will remain occupied during both phases.
Construction Schedule: start 9/2024 and finish 7/31/2027 (approx. 3 years)
There is a PLA on this project.
SLBE Oakland participation is encouraged for this project.
Value engineering ideas are encouraged and to be submitted with proposals.
Constructability review ideas are encouraged.
Location 1926 East 19th Street, Oakland, CA 94606