The Package 1 Project contemplated consists of:
A. Demolition of existing treatment plant components including, but not limited
to Return sludge pumps.
B. SCADA Control System.
C. Mixed Liquor Distribution Box.
D. Secondary Clarifier.
E. Return Sludge Pump Station.
F. Tertiary Filtration.
G. Septage Receiving Station.
H. Grit and Odor Control Systems.
I. Associated piping, valves, controls, electrical, roads, structures and
appurtenances.
The Work will be completed in all respects within 520 calendar days from the date when the Contract Times commence to run.