Bid Details for Milpitas High School- PAC, Second Gym, & Fitness Center – Final GMP

Project
Milpitas High School- PAC, Second Gym, & Fitness Center – Final GMP
Owner
Milpitas Unified School District
Description
This is an Overaa project. We are requesting final pricing based on the DSA Backcheck docs provided.
Scope: the project consists of construction of a new approximately 38,156 square foot performing arts center with supporting classrooms, a new approximately 18,128 square foot gymnasium and a new 11,088 square foot fitness center. The project will also include associate site work, utility connections, landscape and irrigation. The project will require the removal and relocation of solar parking canopies.

Trades include, but are not limited to; Scaffolding, Surveying, Demolition, Concrete Ready-Mix Suppliers, Rebar, Site Concrete & PPF, Concrete Floor Finishes, Masonry, Structural Steel, Metal Decking, Metal Fabrications, Architectural Wood Casework, FRP Plastic Paneling, Waterproofing, Thermal Insulation, Metal Wall Panels, Fiber Cement Siding, Membrane Roofing, Sheet Metal Flashing & Trim, Fireproofing, Firestopping and Joint Seals, Expansion Joints, Doors, Frames & Hardware, Overhead Coiling Doors, Special Doors, Storefronts, Curtain Walls, and Windows, Skylights, Lath & Plaster, Drywall & Framing, Tile, Acoustical Ceilings & Acoustical Insulation, Wood Flooring, Wood Athletic Flooring, Resilient Flooring & Carpet, Fluid Applied Flooring (Epoxy Flooring), Painting & Coatings, Visual Display Boards, Signage, Wall and Corner Protection, Toilet Accessories & Toilet Partitions, Fire Extinguishers & Cabinets, Lockers, Fixed Sun Screens, Theater and Stage Equipment, Athletic & Recreational Equipment, Window Treatments, Multiple Seating, Site Furnishings, Elevators, Fire Protection, Plumbing, HVAC, Electrical, Communications, Earthwork, Grading, & Asphalt Paving, Athletic Surfacing, Pavement Markings, Fences & Gates, Landscape, and Site Utilities

DVBE participation is encouraged.

Anticipated construction start: July 2022
Anticipated construction completion: December 2023
PLA agreement in place.
Breakout pricing as follows for accounting purposes:
  • Site Work
  • Performing Arts Center (building T)
  • 2nd Gym (building N)
  • Fitness Center (building M)
Two Alternates:
1. Building M – Fitness Building and associated site work. Including ramp northwest of proposed Building N (Gym) on sheet 19/L3.01.
2. Installation of electric vehicle charging station(s).
Location
1285 Escuela Parkway, Milpitas, CA 95035
Amount
Bid Walk
Requirements
Availability