Bid Details for LLNL B177 Wet Chemistry Laboratory Reduced Scope

Project
LLNL B177 Wet Chemistry Laboratory Reduced Scope
Owner
LLNL
Description
B177 is a design build ground up scientific laboratory which Overaa is still pursuing.
 
LLNL has reduced the size of the building to reflect current market conditions and budget constraints. Addendum 13 reflects these reductions.
 
We seek bidders to price this current (and expected final) iteration of pricing. Note Addendum 13 converts Site Utilities Scope of Work to an Option. Also, a second option is asked to for construction of storage in 25% increments. See RFP issued with Addendum 13.
 
 
~~~~~~~~
 
Overaa seeks proposals for a Design Build Wet Chemistry Laboratory at Lawrence Livermore National Laboratories.
 
Design, engineer, and construct new single story wet chemistry laboratory building that efficiently supports the LLNL mission totaling. The desired building will have mission critical space with additional support space, totaling approximately 8,000 net square feet.
 
Electrical and mechanical utilities must be brought from tie points on the conceptual site plan into the building underground. LLNL will procure the main power transformer. The transformer must be installed by the subcontractor.
 
Design must be in accordance with:
 
  1. RFP
  2. BOD
  3. PRD
  4. LLNL Sample Subcontract
  5. LLNL Facilities Standards
  6. LLNL Facilities Master Specification
  7. Geotech
  8. Chemical Inventory
  9. All other Project Documents and Project Requirements.
 
 
Work to commence September 11th, 2023.
 
Scopes sought include site demolition, site utilities, earthwork, paving, pavement markings, concrete reinforcement, pump, place and finish (PPF), structural steel & miscellaneous metals, waterproofing, architectural wood casework, countertops, roofing, thermal insulation, flashings, joint sealants, firestopping, glazing & aluminum storefront systems, doors, frames, and hardware (DFH), metal stud framing, drywall, taping & finishing, flooring, painting, acoustical ceilings, joint sealants, laboratory casework, division 10 specialties, signage, Fire sprinkler and Fire Sprinkler Design, HVAC & Controls and HVAC & Controls Design, Plumbing and Plumbing Design, Electrical & Low Voltage and Electrical & Low Voltage Design, fences & gates, landscape
 
Scope specific proposals must include:
 
  1. BASE Proposal Cost: Total project
  2. OPTIONS 1 to 3: Option pricing (See Addendum 13 RFP)
  3. PROJECT EXPERIENCE & KEY PERSONNEL: See “B177 Subcontractor Project Experience & Key Personnel.xlsx” and provide completed forms as early as possible.
 
Design Build Subcontractors must coordinate directly with Architect, Engineers, and Contractors to ensure the design and its details can be constructed within Subcontractor’s budget. Subcontractor shall bear all risk for design-borne changes and their resulting impacts.
 
Disadvantage business participation is encouraged including; small business, women-owned business, veteran-owned small business, service-disabled veteran-owned small business
Location
7000 East Avenue, Livermore, CA 94550
Amount
Estimator
Chris Paulsen
Chris Paulsen

5102340926

Bid Walk
Requirements
Disadvantage business participation is encouraged including; small business, women-owned business, veteran-owned small business, service-disabled veteran-owned small business
Availability