Bid Details for LINCOLN CONTINUATION HIGH SCHOOL

Project
LINCOLN CONTINUATION HIGH SCHOOL
Owner
San Leandro Unified School District
Description
This is a design build project.
Scope of Work Consists of:
Design and construct a new 25,124 SF continuation high school campus; Multi-purpose room, administration wing, kitchen, (12) standard classrooms, Science Lab, Fabrication Lab, life skills classroom, staff and student restrooms, accessible playground areas, associated utilities, demolition, start-up, commissioning, and all other associated work required to provide a complete turnkey project at the new Lincoln High School site. Per the design development drawings, specifications, District Standards, DSA requirements, and all other state and local codes and requirements, required for a complete project.
Construction Schedule:
Start – May 2022
Complete – August 2023
Project Labor Agreement (PLA)
MEPS scopes will be design build by the Subcontractor, you will carry the design and engineer of record.
MEP trades need to be prequalified in order to be awarded the project. Submit your prequalificaiton (found in the MEP Prequalification folder under “files” tab) to the district by time of bid.
DISABLED VETERAN BUSINESS ENTERPRISES (DVBE) subcontractor and supplier participation is encouraged.
Location
1448 Williams Street, San Leandro, CA 94577
Amount
$20,000,000
Estimator
Bid Walk
Requirements
Project Labor Agreement (PLA) MEPS scopes will be design build by the Subcontractor, you will carry the design and engineer of record. MEP trades need to be prequalified in order to be awarded the project. Submit your prequalificaiton (found in the MEP Prequalification folder under “files” tab) to the district by time of bid. DISABLED VETERAN BUSINESS ENTERPRISES (DVBE) subcontractor and supplier participation is encouraged.
Availability
Bridging Documents: See Dropbox link for documents. https://www.dropbox.com/sh/pdr12a46f3ydiia/AAA8E-JNhDgf_cHK3gvuZ4yOa?dl=0