1.    Project Overview
Overaa Construction is the Construction Manager/General contractor (CM/GC) for Lawrence Berkeley National Lab (LBNL) for this project which consists of replacing Building 54 which currently houses their cafeteria. The intent of this project is to prepare the site for the construction of a new facility that will take the place of Building 54. Due to multiple funding sources between LBNL and the Department of Energy for this project all bidders will need to identify and provide in their proposals each scope of work and the corresponding cost between the (2) funding sources. The scope for this project is shown in (2) sets of drawings that are titled 1.Transit Hub & Utilities Project (THUP) and 2.New Facility Prep (SSM A).
Scope of Transit Hub and Utilities Project & New Facility Prep includes, but is not limited to:
Utility relocation, electrical (special requirements apply), abatement, demolition, earthwork, earth retention, drilled piers, cast-in-place concrete, waterproofing, structural steel, miscellaneous metals, AC paving, shuttle stop shelter, site amenities, and landscaping.
68,411 sq. ft.
PREQUALIFICATION – All bidding subcontractors and suppliers on this project are subject to prequalification.
WORK REQUIREMENTS – On-site personnel are subject to LBNL badging process requirements.
TRADE PACKAGES – Trade packages for specific trades have been included and bids will be accepted based on these packages.
SCHEDULE – A project schedule is provided.
SUBCONTRACT – A project specific sample subcontract which differs from the Overaa Standard Subcontract Agreement is included. By submitting a bid, bidders agree to all terms and conditions of Overaa’s Subcontract Agreement; requesting any changes is grounds for bid to be determined non-responsive at Overaa’s sole discretion.
SMALL BUSINESS PLAN – A small Business Subcontracting Plan applies to this project. Subcontracting Goals include the following terms, abbreviations, or acronyms are used throughout this Plan and participation goals:
  • ANC – Alaska Native Corporation
  • HUBZone – Historically Underutilized Business Zone Small Business. 3% participation goal.
  • SB – Small Business concern. (ALL SMALL BUSINESS CONCERNS) 50% participation goal.
  • SDB – Small Disadvantaged Business concern. 5% participation goal
  • VOSB – Veteran-Owned Small Business concern 3% participation goal
  • SDVOSB – Service-Disabled Veteran-Owned Small Business concern. 3% participation goal
  • WOSB – Women-Owned Small Business concern. 5% participation goal
Disadvantaged Business participation is encouraged, feel free to contact our office should you need further assistance.
COVID-19 – All subcontractor personnel are obligated to abide by Overaa and LBNL COVID-19 Protocol at all times.
BUY AMERICAN – All project construction materials, products, and equipment shall be furnished in accordance with the Buy American Act (BAA), FAR clause 52.225-9; Buy American Act – Construction Materials.
Location
1 Cyclotron Rd., Berkeley, CA 94720
Amount
Estimator
Bid Walk
Requirements
SMALL BUSINESS PLAN – A small Business Subcontracting Plan applies to this project. Subcontracting Goals include the following terms, abbreviations, or acronyms are used throughout this Plan and participation goals: ANC – Alaska Native Corporation HUBZone – Historically Underutilized Business Zone Small Business. 3% participation goal. SB – Small Business concern. (ALL SMALL BUSINESS CONCERNS) 50% participation goal. SDB – Small Disadvantaged Business concern. 5% participation goal VOSB – Veteran-Owned Small Business concern 3% participation goal SDVOSB – Service-Disabled Veteran-Owned Small Business concern. 3% participation goal WOSB – Women-Owned Small Business concern. 5% participation goal Disadvantaged Business participation is encouraged, feel free to contact our office should you need further assistance.
Availability
Send quotes by fax to (510)237-2435 or by email to bids@overaa.com Documents are also available for viewing at www.buildingconnected.com and available to purchase from Richmond Blue Print at 510-234-2632.