The Work includes but is not limited to:
The Work includes but is not limited to: all labor, material,
equipment, and services necessary to complete the work in compliance with the specifications, including
but not limited to construction of the following:
1. Two Aerated Lagoon Treatment Ponds.
2. Two Infiltration Basins.
3. Recirculation Pump Station.
4. Influent Pump Station.
5. Headworks.
6. Blower Building.
7. Standby Generator and Pad.
8. Motor Control Centers, Variable Frequency Drive Units, Switchgear.
9. PG&E Service Transformer Pad.
10. Potable Water Service.
11. Operations, Storage, and Electrical Building
12. New SCADA control system and integration.
13. Drilling, construction, and development of six underground monitoring wells.
14. Process and site piping, and appurtenances.
15. Paving, grading, drainage, sitework, etc.
Duration: 420 Working Days.
Disadvantaged Business Enterprise (DBE) Requirements participation is encouraged.