Bid Details for EBMUD – CARTER RESERVOIR REHABILITATION, ARROYO PUMPING PLANT IMPROVEMENT, AND ARROYO RESERVOIR REPLACEMENT

Project
EBMUD – CARTER RESERVOIR REHABILITATION, ARROYO PUMPING PLANT IMPROVEMENT, AND ARROYO RESERVOIR REPLACEMENT
Owner
EBMUD
Description

CARTER RESERVOIR REHABILITATION, ARROYO PUMPING PLANT IMPROVEMENT, AND ARROYO RESERVOIR REPLACEMENT

 

Work includes:
• At Carter Reservoir in Moraga: blasting and recoating of the interior and exterior of the
existing 0.25-million-gallon steel tank, and replacement of the existing wood roof with an
aluminum dome roof, and rehabilitation of the reservoir valve vault and associated
mechanical piping.
• At Arroyo Pumping Plant in Moraga: demolish and replace existing meter.
• At Arroyo Reservoir in Moraga: demolition and removal of the existing 1.0-milliongallon steel tanks, valve pit, and related piping; construction of two steel tanks (0.29
million gallons capacity) Arroyo Reservoir Nos. 1 and 2 including reinforced concrete
foundations, tank shells, aluminum dome roofs, valve structures and associate piping.
and associated work, located in Contra Costa County, CA

 

This project will require multiple trades and types of work; for example (note: this list is not all inclusive): demolition, saw-cutting, concrete coring, hazardous materials handling, grading,
excavation, shoring, fill, concrete, rebar, waterproofing, roofing, tank construction, painting, industrial coatings, bolting, welding, mechanical, electrical, HVAC, pipeline, plumbing,
handrails, guardrails, gratings and railings, fencing, trucking, landscaping, paving, and other required work and trades. For additional description and information, see Document 00 41 01 –
Bid Form, Document 00 41 05 – Description of Bid Items, Section 01 11 00 – Summary of Work, and the remaining contract documents.

All work covered by the contract shall be completed within one-thousand fifty (1050) calendar
days after the issuance of the Notice to Proceed.

EBMUD Contract Equity Program is in effect on this project. District contracting objectives are: Construction 25% White Men; 9% White Women, 25% Ethnic Minorities (Men and Women).

Location
Carter Reservoir located at 39 Shannon Ct, in Moraga, CA 94556 and Arroyo Pumping Plant, located 34 Sanders Ranch Road, in Moraga, CA 94556 and Arroyo Reservoir, located at located at 1198 Alta Mesa, in Moraga, CA 94556
Amount
between $14M and $17M
Bid Walk

The bid walk has already passed.

Requirements
EBMUD Contract Equity Program is in effect on this project. District contracting objectives are: Construction 25% White Men; 9% White Women, 25% Ethnic Minorities (Men and Women).
Availability
Project information, including plans, specifications, plan holders list, bid results, etc., can be found at https://construction-bids.ebmud.com/CurrentorFutureBid.aspx?BidMode=Current