Work of the Project includes, but is not limited to, construction of the following items:
1. Clear the Site of existing facilities, utilities, all vegetation, paving, rubble and other existing Site improvements as indicated, and as required to provide new Work.
2. Provide and maintain barricades, fences and other protective devices as required by the Authority, City of American Canyon ordinances and codes, and as required to protect the public and personnel, for the duration of construction.
3. Perform all excavation, fill, backfill, select fill, Class II AB, Asphaltic Concrete, Concrete and other incidental work required for driveway access, parking and exterior hardscape areas.
4. Fabrication and construction of a metal building as shown on the plans and as specified.
5. Fabrication and construction of an Administration building as shown on the plans and as specified.
6. Installation of utility connections to the buildings and storm drainage for the site as shown and specified.
7. Construction of bioretention areas as shown and specified.
8. Perform all other miscellaneous work as shown and specified, and as may be authorized by Authority.