Bid Details for COGENERATION SYSTEM IMPROVEMENT

Project
COGENERATION SYSTEM IMPROVEMENT
Owner
Delta Diablo
Description

The Cogeneration System Improvements project will include the demolition of the existing and
replacement with new cogeneration engine, digester gas conditioning equipment, exhaust
systems, and boiler as well as upgrades to electrical and control infrastructure and demolition of
an existing digester gas storage sphere. An existing gas storage sphere will also be demolished
as part of this project. This project is eligible for federal tax credits for the District under the
Inflation Reduction Act, but specific requirements must be met by both the District and
Contractor under the IRS regulations regarding labor, scheduling, and domestic content to
maintain the integrity of the Inflation Reduction Act.

 

Portions of the work are required to be
completed before December 31, 2024 while the remainder of the work is required to be
completed within nine hundred sixty (960) consecutive days from the date established in the
Notice to Proceed for the commencement of Contract Time. Refer to Section 00800.

Location
The Work is located within the District’s existing wastewater treatment plant, Antioch, CA
Amount
$16,405,000
Bid Walk

A mandatory prebid conference and project site tour will be held at 2:00 p.m. on June 13, 2024
at the Delta Diablo Board Room, 2500 Pittsburg-Antioch Highway, Antioch, CA. A Bid
submitted by a Bidder not attending the mandatory prebid conference will be considered nonresponsive
and non-responsible.

Requirements
This Project is covered by the Project Labor Agreement dated March 8, 2023 between Delta Diablo (District) and the Contra Costa Building and Construction Trades Council and its affiliated local Unions (“PLA”).
Availability
Copies of the Contract Documents are available at the project BidSync listing: www.bidsync.com