THIS IS AN OVERAA DESIGN-BUILD PURSUIT.
Overaa Construction partnered with Dreyfuss + Blackford Architects is pursuing Alameda County Facilities Needs Priority 1 Program Design-Build Package #1.
We are seeking Subcontractor proposals for scopes including but not limited to:
selective demolition, concrete, miscellaneous metals (railings and metal stairs), rough carpentry, finish carpentry, casework, insulation, roofing, clay tile roofing, skylights, gutters and downspouts, roof hatch, flashing, waterproofing, joint sealants, firestop, glazing, stained glass, doors, frames, door hardware, metal stud framing, gypsum board, plaster, acoustic ceilings, flooring, tile, paint, toilet partitions, toilet accessories, fire extinguisher cabinets and fire extinguishers, roller shades, fire suppression systems, plumbing, HVAC, HVAC controls, electrical, fire alarm, asphalt paving, site concrete, striping.
This project has a 20% Small, Local and Emerging Business (SLEB) requirement. All SLEB subcontractors are highly encouraged to participate. Overaa asks all Small and Disadvantaged Business Enterprise subcontractors to participate.
This project is made up of 16 sub-projects ten of which are on the Fairmont Hospital campus in San Leandro, one elsewhere in San Leandro, two in Hayward, and three in Oakland. None are HCAI / OSHPD. All but one of these will be in operation during construction and work must be closely coordinated with building occupants.
Scope for these projects originates with a Facility Conditions Assessment completed in spring and summer 2024 and the purpose of this project is to extend building lifetimes.
Due to number of sub-projects, documentation is extensive. Overaa will release documents in two formats – one as originally provided and one with all documents combined into a single bookmarked .pdf with reduced file size.
To more quickly navigate contract documents, Overaa has compiled all project documents into a single, bookmarked .pdf. File size reduction has been applied to this document resulting in a single ~800MB file. Recommend using this file to navigate project documents.
Documents as originally provided come in a 6 GB .zip file. Download and extraction of this file requires patience and free disk space. Extraction yields a file tree with multiple sub-folders with pathnames which can be quite long and may cause errors if extracted to a folder located deep within a file system. To extract with minimized chance of error, please confirm your computer system has adequate free space prior to download and extract to a folder on a local desktop.
Overaa will host a series of daily office hours from 9:00 AM to 10:00 AM Thursday Aug 29 through Wed Sept 18 to answer subcontractor questions and assist them to navigate contract documents. Office hours are drop-in and all are welcome to join using this link:
https://overaa.zoom.us/j/87543038098
Overaa will provide a pricing template for all subcontractors to use in a forthcoming message.
Please contact Athan Hadjimarkos at athanh@overaa.com or by phone at 510-234-0926 with any questions. Please submit all proposals to bids@overaa.com and acknowledge all addenda and/or clarifications in your proposal.