Wildwood Elementary School

Project Details

Wildwood was an elementary school lease-leaseback project in Piedmont. It included renovation of five interconnected buildings, seismic upgrades, accessibility improvements, modernization, and site redevelopment. Two of the five buildings were originally built in the 1930s and require extensive structural wood frame and concrete foundation upgrades that were self performed by Overaa Construction. Roofing, plaster, and finishes in most locations were removed and replaced as part of the project. Some of the improvements include new lighting, HVAC systems, wheelchair lift, classrooms renovation, auditorium improvements, new bathrooms, and new offices.

Owner
Piedmont Unified School District
Location
Piedmont, CA
  • Mike Conrad

    Mike Conrad

    Vice President