Construction of a 300,000 SF post tensioned concrete parking structure wedged between BART tracks, a highway, and a dense urban community. The four‐story, 800‐stall facility maximizes space while complementing its diverse neighbors. The design showcases an intricate precast façade and the use of post tensioned slabs. Guardrails alternating between precast concrete panels and perforated metal panels reveal the concrete slab at the perforated panel locations. A close working relationship with the various agencies in the City of Oakland was required to complete this fast track project.
Children’s Hospital Oakland Parking Structure
Construction of a 300,000 SF post tensioned concrete parking structure wedged between BART tracks, a highway, and a dense urban community. The four‐story, 800‐stall facility maximizes space while complementing its diverse neighbors. The design showcases an intricate precast façade and the use of post tensioned slabs. Guardrails alternating between precast concrete panels and perforated metal panels reveal the concrete slab at the perforated panel locations. A close working relationship with the various agencies in the City of Oakland was required to complete this fast track project.