Chevron Refinery Firehouse & Operations Center

Project Details

Demolition of the existing firehouse and construction of a new 21,912 SF concrete masonry firehouse building and emergency communications facility for the Chevron Richmond Refinery campus. Scope covered 10,754 SF of fire apparatus bays and 11,158 SF of office, lockers, and operations area. A massive electrical lab with a dedicated generator and electrical back-up for the entire refinery was also included. The building features new utilities, exhaust systems, mechanical systems, a boiler room, tool room, instrument, and electrical shop. The project utilized 100% local Richmond subcontractors.

 

Owner
Chevron
Location
Richmond, CA
Square Footage
21,912