Design and construction of a 156,604 SF parking structure next to one of BART’s operating stations and a transit oriented development village. Limited site access and working adjacent to the tracks required extensive coordination. Construction of the five-level facility was adapted to accommodate train schedules. The project included tying into existing utilities and installing an emergency generator that operated the station.