BART Fruitvale Parking Structure

This design-build, 156,604 sq.ft., 506-stall parking structure was constructed at an existing BART station, next to one of BART’s operating stations and transit oriented development village. The challenge to the project was coordinating construction around limited access and being next to the tracks. Overaa coordinated construction operations around the train schedule. The project included tying into existing utilities and installing an emergency generator that operated the station.

Owner
BART
Location
Oakland, CA
Square Footage
156,604
Delivery Method
Design Build
Parking Garage Designer
Watry